Mechel-Service has supplied some 4.5 thousand tons of rolled metal for the construction of a bridge over the Samara River.

The first stage of the 6-lane Frunze Bridge with the length of 670 meters will be opened in December.

In construction rebars and beams manufactured at Chelyabinsk Iron and Steel Works have been used.

Mechel-Service also supplied sheets, pipes and metal wares. (Ukrainian metal)

Leave a Reply