Severstal Steel Decisions has finished delivering the main metal frame for the construction of a power plant in Perm region.
The metal structures will be used to construct the building frame of the mini-power plant.
The height of the one-storey building will be 26 meters.
The total weight of metal structures produced is 400 tons. (Ukrainian metal)