Pokrov Mining and Processing Works is carrying out a large-scale reconstruction of its mining machinery – the rotor excavator of the rotor complex No. 9 at the Chkalovsky quarry No. 2.

The work started last autumn, after an accident that occurred in early 2018.

The repair is carried out all the day long.

The metal structures of the V-20 conveyer have to be restored almost from scratch. (Ukrainian metal)

Leave a Reply