The first rock mining and explosive works have been carried out on the territory of the Baranyevskoye deposits.
The first ore is expected to be extracted in late 2018, while in 2019-2020 the Aginsky Mining and Processing Works will reach the design capacity.
The reserves of the deposits are 30 tons of gold and 20 tons of silver. (Ukrainian metal)