Uralmashzavod will supply the sixth EKG-18 excavator to Kuzbassrazrezugol, a part of UGMK.

Since the beginning of the year the company has already received 3 excavators. Assembly of the two of them has begun. 3 more machines will have been supplied by the end of the year.

EKG-18 is one of the most sought after models on the domestic market. In one shift it can load 12-14 thousand cubic meters.

The first EKG-18 for Kuzbassrazrezugol was developed 8 years ago. Since then it has processed 35 million cubic meters of rock.

In 2011-2017 the company received 4 EKG-18s. (Ukrainian metal)

Leave a Reply