Corum Svet Shakhtera has produced a drill loading machine for the Sherlovskaya-Naklonnay mine of the Donugol company.

According to the company statement, the capacity of the machine is 3 cubic meters per minute and the drilling speed is 48 meters per hour.

The reinforcing of the scrapper with the wear-resistant steel will increase its service life 2-3-fold. (Ukrainian metal)

Leave a Reply