Belarus Iron and Steel Works bronzed bead wire mill No. 2 of the steel wire shop No. 1 resumed operation after a fire in November 2017.

Next month the first batches will be shipped to the customers.

The reconstruction and repair of the mill lasted for over 4 months.

The capacity of the mill is 1.8 thousand ton of wire per month.

In Q1 BMZ sold over 6 thousand tons of bronzed bead wire. (Ukrainian metal)

Leave a Reply