Zagorsky Pipe Works has won the right to conclude a long-term contract for the delivery of pipe products for the new nuclear power plant in Leningrad region.
Within a year ZTZ will supply over 5 thousand meters of insulated pipes with the diameter of 1220 mm and the wall thickness of 12 mm.
This is the first long-term contract on the delivery of pipes for atomic industry concluded by ZTZ. (Ukrainian metal)