Ural Turbine Plant will supply a steam turbine T-42/50-2.9 to Magnitogorsk Iron and Steel Works.

The turbine, capacitor, generator, heaters, pump equipment and pipelines will be assembled at the central electric plant of MMK. All the machinery will be supplied in Q2 2018.

The new turbine will replace the AT-25 turbine, produced by the Ural Plant in 1950. (Ukrainian metal)

Leave a Reply