Chelyabinsk Iron and Steel Works has finished an overhaul of its sintering machine.
The machine has been shut down for 8 days. The cost of the repair is 9 million rubles.
The ChMK sintering factory operates 4 sintering machines with the combined capacity of over 5 million tons per year.
Overhauls of the machines are performed each year. (Ukrainian metal)