Uralelectromed has finished repairing its container site and has put it into operation.
The need to repair the old site was caused by the increase of products for sale.
“The site size increased 3-fold, to 1716 square meters. It can now accomodate 206 large containers”, the company railroad shop director Vadim Duvanov said. (Ukrainian metal)