Mednogorsky Copper Sulfate Plant (MCSP, enterprise of UMMC’s metallurgical division) purchased a new front-end loader for about 6 million rubles.
The loader will be used at the area of briquetting and feed preparation for copper smelter to supplement a similar loader, which is said to have been efficiently used.
“Our plant equipment includes many items, which are used at the production site of the company and are involved in the process of blister copper production”, comments Head of Transport Department Alexey Klyavlin. “The new loader is of high loading capacity, with excellent visibility and an ergonomic cab where controls are kept within reach of the operator allowing for better productivity during loading and transportation of copper bearing materials”.
In total over the last couple of years the enterprise has bought more than 20 items of plant and transport fleet worth 52 million rubles. This range includes: trucks, loaders, excavator and buses. (MetalInfo/Ukrainian metal)