In January Voestalpine supplied 24 thousand tons of plate to Vyksa Iron and Steel Works, a part of OMK.
According to the customs statistics, this is 90% of the total 2016 plate imports from Austria.
In April 2016 OMK and Nord Stream-2 AG signed an agreement on the supply of large diameter pipes for the construction of the Nord Stream-2 pipeline.
The 1153 mm diameter pipes with 30.9 mm wall thickness and 34.6 mm outer three-layer anticorrosion and inner coating will be produced at the Vyksa Works. (Ukrainian metal)