Pershotravenskoye Mine Group has put two new long faces at Stepnaya and Yubileynaya mines into operation. Their coal deposits total 1240 thousand tons.

At the Yubileynaya mine new long face it is planned to mine 2 thousand tons of coal daily. Its deposits will be enough for 15 months.

2.1 thousand tons of coal will be mined at the Stepnaya long face. The miners have enough work for a year. (Ukrainian metal)

Leave a Reply