Russia: NLMK to increase electricity output
NLMK intends to increase 1.5-fold the output of its own electricity having constructed a heat electric generation plant at its Lipetsk site operating on the secondary fuel gas (wastes of metal manufacture). The cost of the project is 35 billion rubles. The plant will use the gas that is created when smelting pig iron in…