Severstal Steel Decisions has designed the works to produce polymer strips for food packaging.

The one-storey building will have the size of 60x66x11 meters.

The metal structures weighing 230 tons were manufactured at the Orel site.

The shipping was carried out according to the schedule. (Ukrainian metal)

Leave a Reply