For the first time in its history, Corum Group has started assembling a UKD200-500 shearer not at the plant, but directly at a mine manufacturing site.
The construction of the machine is almost over – the last elements are being installed.
On April 20, the shearer will be given to the buyer.
Corum Svit Shakhtarya has been producing such shearers since 2012. (Ukrainian metal)