The Siberian Mining and Metallurgical Alliance (SiGMA) has been granted the right to commission a gold-extracting factory at the Ozernovskoye deposit in Kamchatka.

The capacity of the factory will be 140 thousand tons of ore per year, which will allow producing up to 1 ton of gold.

In 2024, the second stage is supposed to increase the capacity to 700 thousand tons of ore and 3 tons of gold. (Ukrainian metal)

Leave a Reply