Since June, ArcelorMittal Kriviy Rih has supplied 1.3 thousand tons of rebars for the construction of a new bridge over the Dnepr River in Zaporozhye, or some 50% of the needs.
The construction resumed in April, and the company became the key supplier of A-III A400 rebars with the diameter of 12 to 32 mm.
The overall need of GOST 5781 rolled metal amounts to 3-4 thousand tons. (Ukrainian metal)