During the construction of the Sila Sibiri gas pipeline the Federal Cargo Company has transported 450 thousand tons of pipes, mostly in 2016-2019.
The pipes were delivered to all the construction sites – in the Republic of Sakha (Yakutia), Irkutsk and Amur regions.
Over 11 thousand gondola cars were loaded with large-diameter pipes manufactured at ChTPZ, VMZ, ITZ and Volzhsky Pipe Works. (Ukrainian metal)