Uralelectromed has put into operation its second Outotec pelletizing furnace.
The capacity of the machine is 2.6 tons of slurry per day.
The operation of two furnaces will increase the efficiency of processing raw materials containing precious metals.
The duration of smelting will decrease by 20%, while at the same time increasing the output of precious metals and rare-earth metals, such as selenium and tellurium.
UEM has invested 87 million rubles in the project. (Ukrainian metal)