Khuzhir Enterprises LLC intends by the end of the year to have resumed operation of the gold-extracting factory at the Konevinskoye deposit in the Republic of Buryatia.
In 2020 the company plans to produce at least 400 kg of gold.
Investments in the project reach 400 million rubles.
Khuzhir Enterprises started developing the deposit in 2010. The design capacity of the factory was 100 thousand tons of ore per year with the extraction volume of 94%.
In 2013 the factory processed 130 thousand tons of ore with the extraction volume of 96%. (Ukrainian metal)