Uralelectromed has begun the second stage of the reconstruction of its raw materials warehouse in the railroad shop.

Until the end of the year the company intends to repair the loading site.

The shop warehouse is to be reconstructed in three stages.

In 2018 the company repaired its roof, façade and the ground floor.

The second stage will see the repair of the loading site with the size of some 5 thousand square meters. After that the floor will be repaired and the railroad of 230 meters will be asphalted.

The second stage will be finished in Q3. And the third will start in 2020. (Ukrainian metal)

Leave a Reply