Severstal Steel Decisions has started manufacturing metal structures for the construction of two buildings of foundries of the Cherepovets Iron and Steel Works blast furnace No. 3.
The total volume of the order is over 5 thousand tons. The first thousand tons have already been produced at the site in Orel.
Metal structures will be supplied in two stages. The first stage is scheduled for H1, while the second – for the winter season of 2019-2020. (Ukrainian metal)