Russian holding Safmar invested about $130 million in construction of the Nezhinsky ore-dressing utility in Belarus, including a mine, an ore-dressing plant, electric power generation, railway, highway, housing and other infrastructure, in January-March, Safmar said.
The entire project was estimated at $2 billion and the launch was slated for early 2020.
Safmar said that it would launch the utility on schedule. (Prime/Ukrainian metal)