The forth exhaust system has been put into operation at the Evraz ZSMK sintering factory.

With its commissioning the plant completes gas-purifying system reconstruction.

The combined capacity of 4 machines is 900 thousand cubic meters per hour. The rate of purification is over 99%.

Since 2015 thanks to the machines air pollution has decreased by 425 tons per year.

Investments in the project exceeded 368 million rubles.

The sintering factory operates 3 sintering machines with the combined output of 600 thousand tons of sinter per month. (Ukrainian metal)

Leave a Reply