Energomashspetsstal will produce rolls for two ArcelorMittal European plants.

According to the contracts signed, 6 back-up rolls will be supplied to ArcelorMittal Sagunto SL (Spain).

Another 4 rolls will be produced for ArcelorMittal Eisenhüttenstadt (Germany).

The total weight of the rolls will be 355 tons.

The products will be shipped in Q3 2019.

EMSS and AM have been cooperating since 2011. (Ukrainian metal)

Leave a Reply