ChTPZ has delivered the first 130 tons of seamless pipes to Tyazhmash.
The pipes with the diameter of 426 mm and the wall thickness of 25 mm will be used to construct a tower and a set of cargo-lifting machinery of the Vostochniy launch site.
ChTPZ has been cooperating with Tyazhmash since 2010. (Ukrainian metal)