Russia: ChTPZ supplies 60 thousand pipes to Kharasaveyskoye deposit
ChTPZ Group has shipped over 60 thousand tons of large-diameter pipes to Gazprom for construction of the gas pipeline to connect Kharasaveyskoye deposit to Bovanenkovskoye. Pipes with the outer corrosion-resistant coating with the diameter of 1420 mm and wall thickness of 27.7 and 33.4 mm of K65 steel were produced at Chelyabinsk Iron and Steel…