Altai-Koks has finished the reconstruction of the air-purification system in the coal preparation shop on the territory of the car dumps.

The new machinery allowed increasing air purification of dust from 75% to 99.5% and improving labor conditions.

Investments in the project totaled 100 million rubles. (Ukrainian metal)

Leave a Reply