DTEK Ternovskoye Mine Group has put into operation a new, 188th long face.

The volume of the industrial reserves there is over 420 thousand tons of coal.

DTEK investments totaled 57 million UAH.

The length of the long face is 240 meters. It will provide the miners with work till the end of the year.

Average daily output is expected on the level of 2.2 thousand tons.

This is the third long face put into operation since the start of the year at the Mine Group. By the end of the year 3 more long faces will have been prepared.

In 2018 DTEK Ternovskoye Mine Group intends to mine over 4 million tons of coal. (Ukrainian metal)

Leave a Reply