Zhezkazgan Copper Smelting Works will be operating at full capacity, according to Kazakhmys Smelting.

The plant will operate 2 ore-smelting furnaces and a sulfur acid shop.

In 2009 due to the decrease of available raw materials the works switched to the operation of only 1 smelting furnace.

But as the copper-containing raw materials volumes will increase because of two processing factories commission, it was decided to resurrect the second furnace. (Ukrainian metal)


Your advertisement under each post on this site. DETAILS


Leave Comment

Your email address will not be published. Required fields are marked *

clear formSubmit