Gaysky Mining and Processing Works is finishing the construction of the second branch of the pulp feed line.
The new branch with the diameter of 377 mm is being constructed in the Zakladochnaya mineshaft. It will reach 885 meters.
The construction is carried out taking into account the need to increase its length to reach deeper horizons. It is planned that in time the pulp feed line will reach the depth of 1230 meters. (Ukrainian metal)