Aluminiy Kazakhstana has received a drum with separators and roll glides for its thermoelectric plant produced by the Taganrog boiler works Krasniy Kotelschik.
The machinery has been produced within the program of the boiler equipment reconstruction. The new machinery will replace the boiler drum, produced by TKZ in 1966.
The machinery will be put into operation in 2018. (Ukrainian metal)