SUEK has put a new long face No. 70-10 at the Taldinskaya-Zapadnaya 2 mine into operation.
The expected output is 500 thousand tons of coal per month. The reserves of the face will be enough till the end of the year.
SUEK invested over 2.3 billion rubles into the project. (Ukrainian metal)