In January-April Amur Zoloto mined 364.2 kg of gold at its deposits and 278.6 kg of silver.

All the metal has been smelted at the gold-extracting and processing factory of Yubileyniy GOK.

Amur Zoloto intends to construct a module processing factory with the capacity of 100 thousand tons per year at the Perevalnoye deposits. The first products are expected in 2018. (Ukrainian metal)

Leave a Reply