Metinvest Group of Companies has completed the cold repairs of the Mariupol Ilyich Iron and Steel Works converter #1.

According to the Ilyich CEO Yuri Zinchenko, converter lining has been changed, and worn-out elements have been restored. Moreover, waste-heat boiler and converter frame have been repaired, and an overall inspection of the machinery has been carried out. (Ukrainian metal)

Leave a Reply