The new DSP-70 complex in the Energomashspetsstal electric arc shop has carried out its 7000th smelting.
The complex was commissioned in 2012.
This was the last stage of the 7-year program to modernize the works.
Investments in 2005-2012 exceeded $300 million.
The maximum weight of an ingot produced at EMSS is 415 tons. (Ukrainian metal)