The Ukrainian Metal

Ukraine: DMK to repair coke oven and blast furnace gas pipeline

Dneprovsky Iron and Steel Combine has begun the capital repair of the Du-1220 gas pipeline, which provides for the transportation of the mixed coke oven and blast furnace gas.

The repair will last for 5 months and will cost 1.2 million UAH.

The length of the gas pipeline is 4 km. A site 1.5 km long will be repaired.

The gas pipeline has been operating since 1950. (Ukrainian metal)

Exit mobile version