Uskovskaya mine, a part of Raspadskaya, has commissioned a new 50-22 long face with the reserves of 1.638 million tons of coal.
The length of the long face is 1700 meters.
In order to prepare it for operation some 9 km of excavations have been carried out.
The long face will be in development until early Q2 2020. (Ukrainian metal)