The Ukrainian Metal

Russia: CherMK starts constructing foundation for second coke-oven battery block

Trest Koksokhimmontazh has started laying the foundation for the second block of the coke-oven battery No. 11 at the Cherepovets Iron and Steel Works.

The laying of the lower foundation plate has been carried out in 30 hours and used 3 thousand cubic meters of concrete.

The coke-oven battery No. 11 will have two blocks with the output capacity of 700 thousand tons of coke per year each.

The first block will be commissioned in 2020, and the second in 2021. (Ukrainian metal)

Exit mobile version