Mechel-Service has supplied 1.3 thousand tons of rolled metal for the construction of a bridge over the Pur River between the Urengoy hamlet and the Korotchayevo district in the Yamalo-Nenets Autonomous District.
Rebars manufactured by the Chelyabinsk Iron and Steel Works constituted the major part of the batch,
The length of the bridge will be 1.7 km. (Ukrainian metal)