Karabashmed is finishing a large-scale modernization of the converter site at the metallurgical shop.
The last of the three Kumera converters has been assembled.
All the work is expected to be finished in Q2.
At the same time in the sulfuric acid shop the company is assembling 4 new moist electric filters. (Ukrainian metal)