Karabashmed has started disassembling the first of its three outdated converters in the metal shop.
All the three converters are expected to have been decommissioned by H2.
Instead of the outdated machinery Karabashmed has already assembled three new Kumera converters with dust caps with the volume of 150 tons.
Two converters have already been put into operation. And the third will be commissioned in Q2. (Ukrainian metal)