In January-September the average time of ferrous metals scrap deliveries by railroad to metal works totaled 5.4 days, up by 16.4% YoY.
At the same time, for the batches weighing up to 260 tons (77% of all deliveries) the delivery time was 5.62 days, up by 17.3%.
The smallest increase (by 5.6%) was for the batches of 520 to 1 thousand tons. Their share was 6%. (Ukrainian metal)