The Belozerskaya mine site No. 2 of the DTEK Dobropolyeugol Mine Group mined 93 thousand tons of coal in April, up by 20 thousand tons MoM.

On April 29 they set a record of coal mining, having obtained 5410 tons.

Average daily output at the site is 3208 tons of coal.

The combined coal output at the mine in April was 216 thousand tons. (Ukrainian metal)

Leave a Reply