Belarus Iron and Steel Works bronzed bead wire mill No. 2 of the steel wire shop No. 1 resumed operation after a fire in November 2017.
Next month the first batches will be shipped to the customers.
The reconstruction and repair of the mill lasted for over 4 months.
The capacity of the mill is 1.8 thousand ton of wire per month.
In Q1 BMZ sold over 6 thousand tons of bronzed bead wire. (Ukrainian metal)