The state enterprise Yuzhnodonbasskoye No. 1 Mine Group has concluded an agreement with Dneproprommash LLC on the capital repair of hydraulic struts valued at 3.79 million UAH.
In particular the company has ordered the repair of 96 struts DM14.01.000.
The cost of the repair of one strut is 39461 UAH with VAT.
The contractor provides the 9-month guarantee period for the struts repaired since the date of their commissioning. (Ukrainian metal)