The Sredneuralsky Copper-Smelting Works has started demolishing the main premises of the double superphosphate shop.
The shop was put out of operation in February 2009.
The size of the premises is 17 thousand square meters, it consists of 5 buildings, being demolished one after another.
The demolition of the main premises started in summer of 2017.
The cost of the demolition is 36 million rubles.
The demolition is expected to end in mid-February, and by June 1 a level site covered with crushed stone should be left there. (Ukrainian metal)