The Kirovgrad subsidiary of Uralelectromed – Proizvodstvo Polymetallov – has finished the scheduled capital repairs of the shaft furnace No. 1.
Investments in repair exceeded 77 million rubles.
The specialists have produced and assembled over 320 tons of metal structures, including 120 tons of doghouses.
Repair lasted for 28 days, and over 200 repairmen were involved.
At present Proizvodstvo Polymetallov operates 3 shaft furnaces with the total output of 6 thousand tons of blue and white metal. (Ukrainian metal)